Nov. 14 - studio floor in (engineered hardwood)
Nov. 14th - and more backsplash
Nov. 14th - more backsplash
Nov. 14th - kitchen backsplash installed
Nov. 14 - front door stained to look like wood! Cool!
Oct. 31 - powder room light fixture in
Oct. 31 - studio light in
Oct. 31 - appliances arrive
Oct. 27 - kitchen sink in :) Blanco granite sink in truffle, YUM!
Oct. 27 - fireplace frame up
Oct. 27 - sink and taps in master ensuite
Oct. 27 - powder room sink and faucet
Oct. 25 - living floor in (engineered hardwood)
Oct. 25 - wood and tile transition
Oct. 25 - den flooring in
Oct. 25 - staircase
Oct. 21 - kitchen
Oct. 19 - master floor
Oct. 19 - more counter
Oct. 19 - sinks in
Oct. 19 - guest room floor
Oct. 19 - main bedroom floor
Oct. 17 - bar unit
Oct. 17 - cafe imperial countertops
Oct. 17 - granite counters
Oct. 17 - wood floor install begins
Oct. 17 - ensuite sinks and marble in
Oct. 14 - kitchen waiting for countertops
Oct. 14 - ensuite cabinet waiting for marble countertop
Oct. 14 - tub surround and shower frame
Oct. 14 - marble tub surround done
Oct. 13 - ensuite shower floor...cool crosshatch tile
Oct. 13 - ensuite shower tile accent
Oct. 13 - ensuite shower
Oct. 13 - kitchen cabinets
Oct. 13 - bar area/pantry
Oct. 13 - street view...grey coat almost finished
Oct. 12 - guest ensuite cabinet
Oct. 12 - ensuite cabinet
Oct 10 - kitchen and dining room tile installation
Oct. 10 - kitchen floor going in
October 7 - kitchen install starts :)
Oct 7 - kitchen drawers waiting!
October 7 - kitchen doors waiting :)
Oct 5 - sahara sand studio!!!! Yahooo!!
Oct 5 - trim painted in the great room
Oct 5 - two thirds of 2 walls in the closet :)
Oct 5 - walk in closet organizer installed...my shoe shelves :)
Oct. 5 - laundry room cabinets in and tile floor being laid...thanks, Derek!
Oct. 5 - guest ensuite tile
Oct. 4 - ensuite shower tile and accent row
Sept 30 - Master ensuite...paint done (light blueish/grey)
Sept 29 - accent wall in main hallway - sahara sand as well :)
Sept 28 - exterior grey coat front
Sept 27 - studio primed and ready to paint!
Sept 27 - laundry room first coat - a fun yellowy/green :)
Sept 27 - ensuite primed for painting
Sept 27 - Master bedroom primed
Sept 27 - doors lined up in the great room while being painted
Sept 26 - Extra waterproofing in ensuite shower
My pink shower!! Second step of shower, waterproof membrane - ready for inspection :) Sept 22
Kicks in the kitchen - all ready for the tile install :) Sept 21
street view with new garage doors :) Sept 21
ensuite shower mudded and the bench that Tony built for me :) - Sept 20
ensuite floor mudded - Sept 19
great room trim around windows - Sept 16
tub in - Sept 16
trim around windows in the studio :) Sept 16
subfloor ready for tile in kitchen - Sept 13
trim ready for second floor - Sept 12
mudroom - door to mainfloor powder room - Sept 12
trim around front door - Sept 12
trim around french doors to the mainfloor sundeck - Sept 12
french doors to the den - Sept 12
master ensuite tub deck - Sept 9 (ahhh, I see some sweet soaking taking place in this!!)
interior doors - Sept 9
French doors for the den leaning against the frame of the fire place - Sept 9
Interior doors delivered Sept 9
view of front entrance...there will be a stone, wood pillars arch and the front door will be a walnut/espresso brown :) The room on the lower right is the den and the room on the top left is the Guest room (aka Lynn and Aimes' room!)- Sept 4
street view - Sept 4
Second coat of mud in the kitchen - Sept 4
second coat of mud in the Great Room - Sept 4
Studio ready to mud - Aug 26
Street view - Aug 26...outside being prepped for stone and stucco
Living room ready to mud - August 26
Kitchen ready to mud - August 26
Master bedroom ready to mud - August 20th
The first step in the stucco process... Aug 18
What the studio would look like PINK!! I'm thinking Sahara Sand walls with white trim :)
Walk in dream closet...the size of my old studio! Aug 18
Master dry walled...door to the left goes into the ensuite - Aug 18
Front door and closet insulated - Aug 16
Handsome and handy husband in insulated living room :) Aug 16
Kitchen dry wall - Aug 16
Kitchen insulated - Aug 12
Roof on...July 14
Stairs to second floor...June 30
Second floor going on...June 29
June 22 - street view
June 22 - top floor going on
Main entrance and den
June 12th - main floor
June 12th - main floor
Stairs from basement to main floor
Framed studio :)
June 9th - putting on the main floor...the basement ceilings are 9 feet!!
June 7th - basement walls are being framed :)
Exterior studio walls...
Looking inside at the studio
May 22nd - dirt is all around the house now...
Getting the basement ready for the concrete floor. Sundeck posts in :)
May 13th - filling in the basement and sides of the house :)
My "technical" outline of the studio :)
May 11th - tarring the walls...the dh working hard :)
Filling in the basement with dirt and enjoying the future view from the studio :)
May 9/11 Foundation DONE!!
May 6/11: the view to the right of the lot :D
May 6/11: the foundation is poured...this is a view from the back of the house.
The footings are in and some more labels...
Where the studio will be...fantastic view of mountains and river
April 26, 2011 - digging the hole!!